Financial Free in the Retirement Period by Saving on Stocks
Abstract
This study aims to calculate the minimum estimate of saving stocks per month to be financially free after 30 years of investing in stocks. The research method used is a quantitative method. The results showed that the estimated minimum funds to get passive income of 5 million, which is equivalent for the next 30 years, is IDR 930,936 per month.
Keywords
Full Text:
PDFReferences
Alessie, R., Hochguertel, S., & Soest, A. V. (2004). Ownership of stocks and mutual funds: A panel data analysis. Review of Economics and Statistics, 86(3), 783-796.
Al Nuaimi, Q. A. (2019). Aviation Risk Management to Estimation and Forecasting Share Price of Air France. AL-Anbar University journal of Economic and Administration Sciences, 11(25), 550-556.
Azis, M., Mintarti, S., & Nadir, M. 2015. Manajemen Investasi Fundamental, Teknikal, Perilaku Investor, dan Return Saham (Fundamental Investment Management, Technical, Investor Behavior, and Stock Returns). Yogyakarta: Deepublish.
Dai, Z., Zhou, H., Wen, F., & He, S. (2020). Efficient predictability of stock return volatility: The role of stock market implied volatility. The North American Journal of Economics and Finance, 52, 101174.
Hughes, T. P., Kerry, J. T., Baird, A. H., Connolly, S. R., Chase, T. J., Dietzel, A., & Kerswell, A. (2019). Global warming impairs stock–recruitment dynamics of corals. Nature, 568(7752), 387-390.
Hidayat, T. (2011). Kamus Populer Istilah Investasi (Popular Dictionary of Investment Terms) Jakarta: Mediakita.
Iyappan, R., & Ganesamoorthy, L. (2020). Relationship Between Accounting Variables and Share Price Movement of Information Technology Industry–A Special Reference to Liquidity. Studies in Indian Place Names, 40(19), 619-624.
Gao, G. P., Moulton, P. C., & Ng, D. T. (2017). Institutional ownership and return predictability across economically unrelated stocks. Journal of Financial Intermediation, 31, 45-63.
Gaspars-Wieloch, H. (2019). Project net present value estimation under uncertainty. Central European Journal of Operations Research, 27(1), 179-197.
Jiang, C. X., & Kim, J. C. (2005). Trading costs of non‐US stocks on the New York Stock Exchange: The effect of institutional ownership, analyst following, and market regulation. Journal of Financial Research, 28(3), 439-459.
Oyedokun, G. E., Arotolu, O. A., & Vincent, H. (2019). The Determinant of Equity Share Price and the Listed Deposit Money Banks in Nigeria. Journal of Accounting and Strategic Finance, 2(2), 127-142.
Pramono, P.R. (2011). Seri UKM: Gandakan Uang dengan Prinsip Time Value of Money (UKM Series: Duplicate Money with the Principle of Time Value of Money). Jakarta: Elex Media Komputindo.
PT Bank Central Asia Tbk., (2009). Maintaining Solidity Amidst Challenges. Jakarta: PT Bank Central Asia Tbk.
PT Bank Central Asia Tbk., (2014). Providing Added Value in the Middle of a Transition Period. Jakarta: PT Bank Central Asia Tbk.
PT Bank Central Asia Tbk., (2019). Navigating Change. Jakarta: PT Bank Central Asia Tbk.
PT Bank Rakyat Indonesia Tbk., (200177). What Do More Than 30 Million Customers of The Best Bank in Indonesia Have in Common. Jakarta: PT Bank Rakyat Indonesia Tbk.
PT Bank Rakyat Indonesia Tbk., (2012).Good Governance and Innovation: Our Foundationfor Sustainability Development . Jakarta: PT Bank Rakyat Indonesia Tbk.
PT Bank Rakyat Indonesia Tbk., (2017). Fostering The Nation Through Integrated Banking Solution and MSME Transformation. Jakarta: PT Bank Rakyat Indonesia Tbk.
PT Bank Rakyat Indonesia Tbk., (2019).Never Stop Developing and Empowering the Small to Mean More for the Country. Jakarta: PT Bank Rakyat Indonesia Tbk.
Sulisyanto, S. (2001). Earnings Management: Theory and Empirical Model. Jakarta: Grasindo.
Tharani, S., & Uthayakumar, R. (2020). A novel approach to safety stock management in an integrated supply chain with controllable lead time and ordering cost reduction using present value. RAIRO-Operations Research, 54(5), 1327-1346.
Zaree, M., Kamranrad, R., Zaree, M., & Emami, I. (2020). Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study. Journal of Industrial Engineering and Management Studies, 7(2), 36-55.
DOI: https://doi.org/10.46336/ijbesd.v1i4.95
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 International Journal of Business, Economics, and Social Development
This work is licensed under a Creative Commons Attribution 4.0 International License.
Published By:
IJBESD: Jalan Riung Ampuh No. 3, Riung Bandung, Kota Bandung 40295, Jawa Barat, Indonesia
IJBESD Indexed By:
This work is licensed under a Creative Commons Attribution 4.0 International License.
Comments on this article
"Elapila" (2024-11-21)